CONSTRUCTION OF A ROOF STATION Kodyma, Odesa region

The project for the construction of this rooftop solar power plant provides for the type of placement of photovoltaic modules on the roof of a production building with a membrane coating – on ballasts with an “east/west” orientation.

The company plans to use the electricity generated by the solar power plant for its own consumption, and to sell the surplus of unused electricity generation at market prices.

In addition, the possibility of parallel operation of the solar power plant with two diesel generators of the company with a capacity of 200 kW each was implemented.

Project Details
Power:689,04 kW
Location:Kodyma, Odesa region
Year:2024 year

SPP income calculator

Based on the amount of investment, the calculation will show you the station’s power and the required roof area, which determines the annual generation volume.

You will not purchase these generated kWh from the grid, meaning you won’t have to pay for consumption.

For example, with a station power of 200 kW and a price of $0.235 per kWh, the average monthly savings will be approximately $4,300, resulting in annual savings (including VAT) of around $51,700.

Use this calculator to make your own calculation based on your needs.

  • Invest summ
    40,000 $
  • Station power
    100 kW
  • Your full price per 1 kWh including VAT
    $
  • Generation volume
    kW·hour
  • Average monthly volume
    kW·hour
  • Payback period
    years
  • Annual VAT savings
    $
  • Average monthly savings with VAT
    $
  • Required roof area
    m.sq.