Designed and Built Solar Power Plant in the Mykolaiv Region

A solar power plant was designed and constructed on the territory of the Customer’s parking area located in the Mykolaiv Region to supply the enterprise’s internal energy needs and enable the sale of surplus electricity to the grid at market prices.

The constructed solar power plant has an inverter capacity of 700 kW and a total installed capacity of 1,000 kW in photovoltaic modules.

 

Interested in saving on electricity?

Contact us today to start your journey to clean and profitable solar energy.

Blog

See other Artcles

A competitive market instead of the “Green Tariff”: what should entrepreneurs do?

The system, which was designed to promote the energy decentralization of the country, encourage the transition to alternative energy sources, and also become a passive income for Ukrainians, after a few years, has fulfilled part of its tasks and will completely stop its operation by the end of 2029. Why is it currently not profitable to build solar stations under the "Green" tariff and why build for own consumption or sale of electricity to the system?

Active consumer and the new Net billing system: does it make sense for enterprises to invest in solar power station?

Already in 2024, the signing of contracts with suppliers under the “Green Tariff” system has been stopped and a new system has been introduced - Net billing. It has successfully fulfilled its function of stimulating the transition to renewable energy sources and it is time to move on.